Territorija Neftegas № 8 2015

№ 8 2015
BUY

Read in this issue:

Drilling

»  Determination of direction of the maximum horizontal stress according to the vertical well directional survey data

Geology

»  Predicting of reservoir pressure in the clay-shale reservoirs with the use of the region С of the Ordos field

Maintenance and repair of wells

»  Stress-strain analysis of APRS-40 unit tower with the use of computer simulation

Oil and gas

»  Prospects of application of formation fluid magnetic treatment to control the electric submersible pumps efficiency in abnormal operating conditions
»  Information system for analysis and monitoring of artificial lift well operation for optimization business processes of oil production

Repair of pipelines

»  Pipeline service life assessment procedure

Transport, storage and processing of oil and gas

»  Modeling of pump station stoppage mode

Welding

»  Main pipelines, repaired with split couplings, performance analysis
»  Study of the effect of heat treatment pipeline fittings made of high strength steels on the change of strength characteristics
»  Mechanical test method features for measurement of fracture toughness in steel tube weld joints, used in Gazprom Co objects
»  Inspection control of welding production at manufacturers of pipe products and equipment for Gazprom PJSC
»  Welding industry condition at Gazprom Public Company. Main lines for development


← Back to list