Due to the fact that the process of the gas injection lasts over a long period, in order to reduce various types of risks, in particular, GPU arrangement and capacity, as well as reconstruction of the existing gas transmission network system the phased development of Bobrikovsky reservoir is suggested. This provides for the possibility of the expansion.
The stage of trial operation with the indicators of the first phase of the reservoir development is suggested. Such a strategy will allow minimizing the risks of the arrangement, reconstruction scopes of the existing gas transportation system and make timely adjustments to the process design of Arbuzov UGSF creation and cyclic operation.
Keywords: gas, gas reserve, gas consumption, amount of reserve, daily output, reservoir pressure, active volume, surge volume,
gas extraction, well
Open PDF